MGC Technical Services. Logo

Wilts Wholesale Distribution Hub, Trowbridge

Wilts Electrical Logo

MG Cavill was requested to design, supply and install a dedicated server room to house their business critical computer servers and network equipment. In addition security and failover services had to be designed and implemented together with air conditioning and environmental and systems.

UPS and Generator

John Deere Logo

The company required a robust system which was capable of running without any downtime, even in the event of a complete mains power failure. To achieve this requirement, MG Cavill recommended the installation of a two stage failover uninterrupted power supply system (UPS).

The first level of protection being the installation of two 50 kVA chloride UPS, providing a reserve of approximately 10 minutes of battery running time.

In the event of prolonged power outage, a second level of protection was supplied by automatic switch-over to a coupled 120 kVA John Deere diesel powered generator.

Environment and Air Conditioning

Daiken Logo

As it is very important to maintain a stabilised air conditioning system in server rooms to help safeguard against over heating equipment failure and reduce the risk of fire, a efficient and reliable system was required. MG Cavill recommended the installation of a Daiken air conditioning system, controlled and monitored remotely from a central controller.

A raised access floor was installed to provide ease of access to the server cabinets from below, allowing important access to network and power distribution cabling to be installed and maintained whilst providing guaranteed 24 hour uptime of the servers during the installation process.

Sorry

MGC Technical Services. no longer offer support for your browser.

For a faster, safer browsing experience
and to make use of the MGC Technical Services. site features

Upgrade Now for FREE